Build a Workshop Game Around Shared Parts Supply

Design several repair shops that share parts stock, supplier orders and delivery capacity. Test one repair demand change before adding pricing.

Seele Editorial TeamUpdated November 19, 2026

A group of repair shops becomes a connected management game when every location draws parts from the same stock and delivery route. A rise in brake repairs at one workshop can affect what another shop can finish. Shared supply makes job selection, purchasing and allocation matter across the business.

Start with two workshops, two part types and one supplier van. Give each shop a fixed job forecast; let the network allocate the available stock and capacity. This deterministic example checks the allocation rule before adding prices, technician skill or uncertain repair diagnoses.

Two auto repair shops share parts stock and deliveries from one supplier.

Tie repair jobs to shared parts inventory

Represent each repair job as a parts request with a due time. Keep parts in one shared inventory and show each workshop’s request, allocated quantity and delivered amount. A job should move to ready only when its required parts arrive.

Make delivery capacity visible as a separate limit. The supplier may have enough stock overall, yet the van may not carry every workshop’s order on the same run. Show whether an unfinished job is waiting for stock or transport so the player can respond to the right constraint.

Keep the first model to two shops and two part types. Hold job mix and supplier stock fixed while changing one brake-job forecast. Add procurement lead times and technician scheduling after players understand allocation.

See Godot’s Resource documentation for data objects that can represent parts, repair jobs and orders.

A supplier divides brake kits and filters between two repair shops.
Two shops request brake and filter parts from one stock pool and delivery run.

Change one repair forecast, keep supply fixed

The supplier has 10 brake kits and 12 oil filters; the van carries 18 boxes. Shop A requests 7 kits and 6 filters. Shop B requests 6 kits and 4 filters. Kit demand exceeds stock by 3 and the total order exceeds van capacity by 5.

Increase only Shop A’s brake-job forecast by two kits. Under first-come priority, Shop B loses two kits; under proportional allocation, both shops share the shortage. Keep filters, van capacity and all other jobs unchanged to isolate the parts policy.

This deterministic model checks stock and capacity arithmetic only. It does not test repair diagnosis, technician workload, customer satisfaction, profitability or whether allocation feels fair.

Extra brake jobs at one shop reduce kit delivery available to the other.
Two extra brake jobs shift which workshop can complete its booked repairs.

Ask AI for an inspectable workshop loop

Show repair demand, part request, allocation and delivery separately.

Compare allocation policies with only one forecast changed.

Create an original car workshop management prototype with two repair shops, one shared supplier and one delivery van. Track brake kits and oil filters as shared stock. The supplier has 10 kits and 12 filters; the van carries 18 boxes. Shop A requests 7 kits and 6 filters, Shop B requests 6 kits and 4 filters. Show requests, allocations, delivered parts and which jobs are ready. Compare first-come priority with proportional allocation, then increase only Shop A brake-kit demand by 2. Keep jobs, prices and technician skill fixed.

Tune parts allocation before pricing and staffing

Shared parts make one workshop’s job mix affect the others. Keep stock, van capacity and job readiness visible so players can trace why a repair is delayed. Once the allocation rule is clear, add purchase lead times, technician scheduling and pricing as separate systems.

Start a shared-parts workshop prototype with SEELE’s AI game maker

Frequently asked questions

When should a repair job become ready?

Mark a job ready when its required parts have been delivered to that workshop. Keep requested, allocated and delivered quantities distinct, because a supplier can allocate stock before the delivery run arrives. This makes it clear whether a delay comes from inventory, transport or the repair itself.

How do multiple workshops share scarce parts?

Choose a visible allocation rule such as first-come priority or proportional sharing. Show the requests and results so players can anticipate which jobs will wait. Avoid changing allocation, supplier stock and job mix together while testing the rule. Keep the job list fixed while comparing the two rules.

Does a stock model prove the simulator is balanced?

No. It checks quantities and delivery capacity under fixed requests. It does not assess repair realism, technician workload, fairness or profitability. Those require a playable prototype with varied job mixes and supplier conditions. Review several job patterns before adding economic balance claims.

SEELE AI

Turn this guide into a playable build.

Start with a focused brief, then iterate in the Seele AI Workspace.

Start creating